Selected Key Assignments
A Malaysian Port Operator [Sdn. Bhd.] (Corporate Finance Advisory, 2006)
We assisted our client in assessing the financial feasibility of a mass
transportation project (size >US$1Bn) which included an integration
of rail, road and tunnel transportation.
The aforementioned transport infrastructure is highly required as the
existing transport infrastructure has reached capacity limitations. Its
existence would be highly catalytic for the economic development of the
surrounding areas and is pivotal for the development of Malaysia as a
whole.
We built a detailed, robust and highly integrated model to simulate the
financial needs and conditions of the project. The model was also used
to simulate possible risk scenarios of the project and to analyse the
ability of the proposed funding structure to withstand such
variability. Included in some of our proposed funding structures are
efficient and balanced PFI funding structures.
We have also been assisting our client for their strategic positioning
of the project with relevant government authorities and agencies.
